TENDERS

Expression of Interest (EOI) for Funding, Design and Construction of Wiyumiririe Dams Water Projects

Posted at December 1, 2017 | By : | Categories : TENDERS | 0 Comment
  1. GENERAL BACKGROUND

Northern Water Services Board (NWSB) was established through Gazzette Notice No. 1329 of February 2004 under Section 51 of the Water Act 2002 in line with the Water Act 2002, and license issued by the Water Service Regulatory Board (WASREB), the Board has the legal responsibility of ensuring cost effective and sustainable provision of water and sanitation services in its area of jurisdiction which include seven counties of Garissa,Wajir, Mandera, Marsabit, Isiolo, Samburu and Laikipia.

 

  1. Project Background

Wiyumiririe Multipurpose Dam is one of Kenya vision 2030 development projects. The project targets to supply potable and adequate water by gravity to areas of Nyandarua County that have been experiencing acute water shortage and areas of Laikipia County that include Nyahuru Township and its environs which are currently served by a pumping scheme that abstract water from a polluted source that makes operation and maintenance costs of the existing water system very expensive. The dam is located 37km to the south east of Nyahururu Town and across Pesi River and targets to impound 16,000,000m3 of water. This project will consist of 45m high earthfill dam with clay core embankment and associated works, intake tower of 3,000m  capacity, clear water transmission steel/HDPE pipeline of diameters ranging from 1000mm to 200mm and total length of 160km and other storage tanks of total capacity of 4,000m3

Download Link: Expression of Interest (EOI) for Funding, Design and Construction of Wiyumiririe Dams Water Projects